Barcelona promotes a new Comprehensive Maintenance Plan (PMI) for 2025
The Integral Maintenance Plan (PMI) is gaining momentum in 2025 with interventions in 29 neighborhoods of the city. This program, which aims to anticipate the needs to avoid incidents and guarantee the quality of public space, will have an investment of 100 million euros.
At the same time, the daily repairs of damages are still underway, with an annual allocation of 550 million euros.A global plan to improve urban space
The PMI includes a wide range of actions, such as the renovation of the pavement, lighting, traffic lights, sewerage, water network, urban furniture, sidewalks, signage, fountains and vertical mobility systems (stairs and elevators), among others.
The grouping of interventions by neighborhoods allows a comprehensive view of the needs of the territory, optimizing resources and reducing inconvenience for neighbors.
Neighborhoods where action will take place in 2025
- Ciutat Vella: the Raval, the Gothic and the Ciutadella Park.
- L'Eixample: the New Left of the Eixample and Sant Antoni.
- Sants-Montjuïc: El Poble-sec, the Marina del Prat Vermell, the Font de la Guatlla and the Bordeta.
- Les Corts: Les Corts.
- Sarrià — Sant Gervasi: the Three Towers and Sant Gervasi — the Bonanova.
- Gràcia: the Coll and the Vila de Gràcia.
- Horta-Guinardó: the Guinardó, the Font d'en Fargues, the Clota and the Horta.
- Nou Barris: Porta, Can Peguera, La Trinitat Nova and Torre Baró.
- Sant Andreu: Baron de Viver, the Good Shepherd and the Congress and the Indians.
Long-term planning
The PMI will continue in 2026 with 28 more neighborhoods and in 2027 with an additional 16 neighborhoods, ensuring that the entire city benefits from these improvements before 2028.
In addition, this year will address the comprehensive renovation of 24 streets and squares, improving the safety and functionality of the public space.
Real-time tracking
To facilitate the monitoring of the actions, an interactive map has been put in place that allows you to locate each intervention and filter the searches by neighborhood, district or type of work.
Results for 2024
During 2024, more than 150 special maintenance and improvement actions were carried out, including the integral transformation of 11 streets or squares. Among the outstanding interventions, 30 hectares of pavement have been renovated, 15 slopes stabilized, the water table network expanded in seven sectors and 31 improvements in lighting, sidewalks, signage and urban infrastructures such as railings, platforms and stairs have been carried out.
This continued effort reaffirms the city's commitment to the maintenance and constant improvement of public space to ensure safer, more efficient and sustainable urban infrastructure.